Thomas Field Hall: Final Details

The final details in the last week.

We have strong cast brass hooks to hold the outside doors open securely. They are finished in satin steel to match the door handles and have been very carefully positioned on the walls with their loops carefully positioned on the doors.

Since the second photo above was taken the portable loo has been collected, grass seed has been sown on the topsoil around the new Hall and on the site of the site hut. The repairs to the bonded gravel on the path have been done and the bricks at the edge have been lifted and neatly relaid.  Once the grass has grown all vestige of the building site will have gone and the churchyard will look as if it has never been touched.  The Thomas Field Hall is nearly complete.

Barbara Sheard and Michael Carver
Churchwardens