Thomas Field Hall: The Kitchen has Arrived

The kitchen units were delivered and are now being installed. This should take about five days as there are a lot of units to get in as well as the appliances to fit and sinks to plumb in. We are installing a commercial dishwasher in order to make clearing up after events very efficient. We looked at several other kitchens before designing ours and we were strongly advised that this was the best type of dishwasher to put in, despite the extra initial cost, so we hope it will prove to wash up to its reputation! 

The kitchen is installed

The fire alarm system has now been installed in the church and connected up in the Ambulatory. Because we have an original church window looking into the Ambulatory it compromises the required fire separation between the two areas, so we have had to put in the alarm system in order to comply with regulations.

The second fix joinery is now being done with the skirtings and architraves to the door frames being fitted.